Warning – Carrier DIRECT VENT 4 58HDV User Manual

Page 32

Advertising
background image

32

B
PVC Intake/Combustion Air

B PVC
Vent/Exhaust

D

A

1

1

/

2

C

Model

A*

B

C

D**

KGAVT0801CVT

38

7

/

8

3

4

1

/

2

21

1

/

8

KGAVT0701CVT

33

3

/

8

2

3

1

/

2

16

5

/

8

* = Dimension will change accordingly as dimension D is lengthened

or shortened.
**= Dimension D may be lengthened to 60

″ may also be shortened by

cutting the pipes provided in the kit to 12

″ minimum.

(38 mm)

A09195

Fig. 33 -- Concentric Vent Dimensional Drawing

Table 5

Concentric Termination Kit

KGAVT0701CVT & KGAVT0801CVT

Venting Table Dual Piping ONLY

40,000, 50,000, 60,000, & 75,000 Btuh Furnaces

KGAVT0701CVT -- 35′ (10.7m) & (4) 90° elbows

with 2″ (50.8mm) PVC pipe

80,000, 100,000 & 125,000 Btuh Furnaces

KGAVT0801CVT -- 35′ (10.7m) & (4) 90° elbows

with 3″ (76.2mm) PVC pipe

1. Do not include the field supplied 45° elbow in the

total elbow count.

2. If more than four elbows are required, reduce the

length of both the inlet and the exhaust pipes five feet

for each additional elbow used.

3. Elbows are DWV long radius type for 2

(50.8mm)

and 3

(76.2mm) vents.

If more than four elbows are required, reduce the length of both

the inlet and exhaust pipes 5(1.5m)for each additional elbow

used.
*
Feet of pipe is whichever pipe run is the longest, either inlet or

outlet side.
If assembly needs to be extended to meet height or side wall

thickness requirement, the two pipes supplied in the kit may be
replaced by using the same diameter solid, single (no coupling

connections) field supplied SDR--26 PVC (ASTM D2241) pipes.

Do not extend dimension D more than 60″(1524mm). (See Fig.

33.)
Do not use field supplied couplings to extend the pipes. Airflow

restriction will occur and the furnace pressure switch may cause

intermittent operation.

5. Partially assemble the concentric vent termination kit. Clean

and cement the parts using the procedures for Joining Pipe
and Fittings section of the manual.

a. Cement the Y Concentric fitting to the longest of the

two straight kit pipes. See Fig. 34.

b. Cement the rain cap to the shortest of the straight kit

parts. (See Fig. 34.)

NOTE: A field supplied stainless steel screw may be used to
secure the rain cap to the pipe instead of cementing when field
disassembly is desired for cleaning (See Fig. 34.)

Drill clearance hole in rain
cap and pilot hole in vent pipe.

Stainless steel screw
(Field supplied)

A07722

Fig. 34 -- Rain Cap to Vent Pipe Assembly

CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury

or death.
When using the alternate screw assembly method, drill a

clearance hole in the rain cap and a pilot hole in the vent pipe

for the screw size being used. Failure to drill adequate holes

may cause cracking of the PVC components, allowing flue

gasses to be recirculated.

!

WARNING

6. Install the Y concentric fitting and the pipe assembly

through the structure’s hole. For vertical termination, install
the parts through the field supplied roof boot/flashing.

NOTE: Do not allow insulation or other materials to

accumulate inside the pipe assembly when installing through
the structure’s hole.

CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury

or death.
Do not operate the furnace with the rain cap removed as

recirculating of the flue gasses may occur. Water may also

collect inside the larger combustion air pipe and flow to the

burner enclosure.

!

WARNING

7. Secure the assembly to the structure as shown in Fig. 32 or

Fig. 36 using field supplied metal strapping or equivalent
material.

NOTE: Ensure the termination height is above the roof surface or
anticipated snow level as shown in Fig. 32 for vertical termination.
Ensure the termination location clearance dimensions are as shown
in Fig. 35 and Fig. 36 for horizontal termination.

8. Install the rain cap and the small diameter pipe assembly in

the Y concentric fitting and the large pipe assembly. Ensure

that the small diameter pipe is bottomed out and securely
cemented in the Y concentric fitting.

9. Cement the furnace combustion air and vent pipes to the

concentric vent termination assembly. See Fig. 32 or Fig. 36
for proper pipe attachment.

10. Operate the furnace through one heat cycle to ensure

combustion air and vent pipes are properly connected to the

concentric termination connections.

58H

D

V

Advertising