Caution, Cooling, Optional equipment – Carrier DIRECT VENT 4 58HDV User Manual

Page 38: Furnace control fuse, Tap select interface board, Humidifier/electronic air cleaner, Furnace control board, Dehumidification

Advertising
background image

38

For two--stage thermostat installations, the R, W1 and W2 wires
from the thermostat connect to the R, W1 and W2 connections on

the furnace control board. Set TT SW1 DIP switch #3 to ON
position. During operation, the furnace will shift from Low Heat to

High Heat as requested by the thermostat. (See Fig. 40 and wiring

diagram)
Heat anticipator setting will need to be measured if 24VAC

humidifier is installed. Measure current in series from R to W1 at
the thermostat. Be sure 24VAC humidifier is operating during this

check. Allow furnace to operate for 2 minutes before recording the

AC amperage reading. Set anticipator on thermostat to recorded
value.
Thermostat location has an important effect on the operation of the
furnace. Follow instructions included with thermostat for correct

mounting and wiring.
Low voltage connections to furnace must be made on terminal
board to furnace control board. (See Fig. 41)

Cooling

If single--speed cooling is used, the Y and G from the thermostat

must be connected to the control board Y/Y2 and G to energize
cooling blower speed.
If two--stage cooling is used, the Y1, Y2, G of the thermostat must
be connected to Y1 of tap select interface board for low cooling,

Y/Y2 of the furnace control board for high cooling and G of the
furnace control board for continuous fan speed.

Optional Equipment

All wiring from furnace to optional equipment MUST conform to

local codes or, in the absence of local codes with the latest edition
of The National Electric Code, ANSI NFPA 70 and/or The

Canadian Electric Code CSA C22.1. Install wiring in accordance

with manufacturer’s instructions. The wiring MUST have a
minimum temperature rating of 105° C.

Humidifier/Electronic Air Cleaner

The furnace is wired for humidifier and/or electronic air cleaner

connection.
HUMIDIFIER -- The HUM (24V) terminal is energized when the

low pressure switch closes on a call for heat. The HUM (115V) is

energized when the inducer is energized.
ELECTRONIC AIR CLEANER -- EAC terminal is energized

when there is a blower speed call, except it is NOT energized when
blower operates in the hard--wired continuous fan mode.

REDUCED FURNACE LIFE HAZARD
Failure to follow this caution may result in reduced furnace

life.
Do NOT exceed 115V/1.0 amp. maximum current load for

both the EAC terminal and the HUM terminal combined.

CAUTION

!

Furnace Control Board

The furnace control board has a fixed blower ON delay of 30

seconds for High Heat calls and 45 seconds for Low Heat calls. The
blower OFF timing is factory preset at 140 seconds. If desired, the

fan OFF delay can be reset to obtain the longest delay times while
still maintaining comfort levels. See “Furnace Wiring Diagram”.

Dehumidification

The furnace control board has a dehumidification feature which

reduces cooling airflow by 20% when the DEHUM terminal (

1

/

4

male quick connect) is energized by 24VAC and there is a cooling
call. DEHUM may be operated by a thermostat dehumidify

(24VAC for dehumidify) command or a dehumidistat (switch closes
on call for dehumidification) with one terminal connected to (Y1

for two--stage cooling or Y/Y2 for single--speed cooling

applications) and the other terminal connected to DEHUM.

Furnace Control Fuse

The 24V circuit contains a 5--amp, automotive--type fuse located on

furnace control board. (See Fig. 41) Any electrical shorts of 24V

wiring during installation, service, or maintenance may cause fuse
to blow. If fuse replacement is required, use only a fuse of identical

size (5 amp.)

C

W2

R

W1

G

C

Y/Y2

W2

R

W1

G

Y/Y2

W2

* Permissible limits of voltage at which unit will operate satisfactorily

Connection

Box

NEUT

.

HOT

Ground

115V. 60 Hz.

G

R

W1

G

G

TerminalBoard

LowVoltage

Thermostat

TwoStage

Operatingvoltagerange*:127VACmax,104VACmin.

NOTE:115VAC/60Hz/single----phase

Thermostat

SingleStage

R

W

TerminalBoard

LowVoltage

BK

W

A07779

Fig. 40 -- Electrical Connections

Tap Select Interface Board

The Tap Select Interface Board is used with the Variable Speed
motor. There are DIP switches (SW2) for continuous blower adjust,

heating blower adjust, cooling blower adjust and cooling on/off

delay profiles. There is a jumper (J1) for slight blower adjustment,
increase (+)/no change (NOM)/decrease (--). There is a jumper (J2)

for airflow selection of Heat Pump EFFICIENCY or COMFORT.
(EFFICIENCY provides no airflow reduction in airflow whether

O is energized or not. COMFORT provides a 10% reduction in

airflow when O is not energized with a cooling call).
The O terminal is available for use for Heat Pump applications, if

desired.
The Y1 terminal (if a two--stage Air Conditioner or two--stage Heat

Pump is used) will provide low cooling blower speed when
energized. (Only Y/Y2 on the furnace control board is used if a

single--stage Air Conditioner or Heat Pump is installed)

58H

D

V

Advertising