Horizontal left through top, See fig. 16), 58h d v – Carrier DIRECT VENT 4 58HDV User Manual

Page 23

Advertising
background image

23

AIR

FLO

W

OF

F

ON

Plastic Caps
Yellow or black

Vent Drain
& Clamps

Trap Connection

“Clamp ears”
Pointed OUT

Preassemble &
insert into furnace

25--24--70

Single Pressure Switch Detail

Dual Pressure Switch

Tee Trap White PVC
(loose parts bag)

Cap and Clamp
Open End

Flexible tubing connector

3

/

16

(4.8mm) OD (Loose

Parts Bag)

EXHAUS

T

Alternate Orientation

Field
Supplied Tee

Cut Here

Cut at straight section

Leave room for clamp

Relief Tube Extension
Black Rubber

3

/

16

(4.8mm) ID

Cut to Fit (Loose Parts Bag)

AIR

FL

OW

Coupling & Clamps
(Optional)

Relief Tube Black Rubber

3

/

16

(4.8mm) ID

Drain Tube
Black Rubber

1

/

2

(12.7mm) ID

& Clamps

Drain Tube Corrugated

5

/

8

(15.9mm) ID & Clamps

Representative drawing only, some models may vary in appearance.

Remove KO before
mounting Trap

A07709

Fig. 16 -- Horizontal Left through Top

Horizontal Left through Top

(See Fig. 16)

Disconnect the hoses from the trap assembly, and remove trap and
trap mounting bracket from the blower compartment. Using cover

plate and gasket provided in the loose parts bag, cover the hole
from the burner compartment to the blower compartment and

secure with screws.
Remove knockout from the side of the furnace casing where drain
tube will exit.
Mount the trap externally to the bottom side of the unit using the
two screws provided in the location shown.
Cut the corrugated tube as shown in the illustration above. Connect

the corrugated hose from the transition to the trap.

Secure

connections with clamps.
Remove the black

1

/

2

″ (12.7mm) ID drain tube from the drain tee.

Install a yellow cap and clamp over the open drain port of the drain

tee.
Connect the black

1

/

2

″ (12.7mm) ID drain tube from the Vent Drain

to the trap. Secure connections with clamps.

Connect the

3

/

16

″ (4.8mm) ID relief tube to the middle port on the

trap. If an extension is required, use the

3

/

16

″ (4.8mm) OD flexible

tubing connector and the black

3

/

16

″ (4.8mm) ID relief tube in the

loose parts bag. Cut tube to length. Secure all connections with

clamps.
Cut an appropriate length of 2″ (50.8mm) PVC pipe, long enough

to exit the cabinet and connect the vent drain to either:

S

A 2″ (50.8mm) PVC coupling fastened onto the drain tee

Install tee trap into bottom section of tee and glue pipe.
Connect the tee trap and the main drain line exiting the casing as

shown in Fig. 16.
NOTE:

It is recommended that all PVC piping and fitting

connections be fit up and inspected before final cementing. Both
the external trap and the external tee trap must be primed
before operation.
Verify all condensate drain connections are
securely clamped. A coupling and clamps (in loose part bag) may
be installed as shown for future servicing of the vent system.

58H

D

V

Advertising