Using exterior risers, Vertical termination, Vent termination shielding – Carrier DIRECT VENT 4 58HDV User Manual

Page 29: Multi vent termination clearances

Advertising
background image

29

Using Exterior Risers

1. Install elbows and pipe to form riser as shown in Fig. 23
2. Secure vent pipe to wall with galvanized strap or other rust

resistant material to restrain pipe from moving.

3. Insulate pipe with Armaflex or equivalent moisture resistant

closed cell foam insulation or Fiberglass insulation if boxed

in and sealed against moisture.

Vertical Termination

1. Fig. 25 shows the proper installation and clearances for

vertical vent termination. The vertical roof termination
should be sealed with a plumbing roof boot or equivalent

flashing. The inlet of the intake pipe and end of the exhaust
vent must be terminated no less than 12″ (307.8mm) above

the roof or snow accumulation level, and 12″ (307.8mm)

away from a vertical wall or other protrusion.

2. If the vent system is installed in an existing chimney make

sure clearances shown in Fig. 25 are maintained. Horizontal
section before the termination elbow can be extended on the

inlet air to provide necessary clearance.

Vent Termination Shielding

Under certain wind conditions some building materials may be

affected by flue products expelled in close proximity to unprotected

surfaces. Sealing or shielding of the exposed surfaces with a
corrosion resistant material (such as aluminum sheeting) may be

required to prevent staining or deterioration. The protective material
should be attached and sealed (if necessary) to the building before

attaching the vent terminal.

Multi Vent Termination Clearances

When two (2) or more furnaces are vented near each other, each

furnace must be individually vented.
Two (2) vent terminations may be installed as shown in Fig. 26, 27,

28, 29, and 30 but the next vent termination must be at least 36″

(914.4mm) away from first two terminations. It is important that

vent terminations be made as shown to avoid recirculation of flue

gases.

12 ” (304.8mm)
MIN.

8” (203.2mm)* MIN.

20’ (6.1m) MAX

25--00--04F

8” (203.2mm)

MIN.

GRADE LEVEL

SNOW LEVEL

OR

*18

(457.2mm) Minimum for

cold climates [sustained 0

_F

(- 17

_C) and below for 24 or

more consecutive hours]

A07716

Fig. 23 -- Sidewall Termination with Exterior Risers to Get

Above Snow Level or Grade Level

OVERHANG

12

(304.8mm) MIN. Ground

Level OR Snow Level

INLET

EXHAUST

90

°

Same Joist

Space

FRONT VIEW

SIDE VIEW

25- 23- 73

12

(304.8mm) MIN.

12

(304.8mm) MIN.

A07699

Fig. 24 -- Recommended Alternate Installation

for Sustained Cold Weather

(0_F (--17_C) & below for 24 or more consecutive hours)

25--00--06

A

A

B

A = 12

(304.8mm) Above roof or snow accumulation level

B = 8

(203.2mm) Min., 20(6.1m) Maximum, except in areas

with extreme cold temperatures [sustained 0

°F(--17°C) and

below for 24 or more consecutive hours], the 18

(457.2mm)

Min.

A07717

Fig. 25 -- Rooftop Termination

58H

D

V

Advertising