SECTION V - OPERATION


5.9

MANUAL ROTATION CALIBRATION

2. Press the F key under MANUAL. The screen will return to the first SET UP

screen and the system is now set for MANUAL calibration. Press the C key

to return to the STATUS screen.

3. To manually calibrate the user will need to have a Weld Schedule in the

Library programmed in accordance to the Calibration Procedure contained in

the operation manual for the particular Weld Head being used.

A MANUAL calibration schedule will always be run in TEST Mode and

usually contains the following:

PRE-PURGE-POST UP-SLOPE-DOWN ROT-DLY

000 000 00.0 00.0 CCW 00.0

LVL-TIME PRI-AMP-BCK PRI-PULSE-BCK
1 *** 000 000 0.00 0.00

LVL PULSE ROT PRI--RPM--BCK

1 OFF CONT *** ***

LVL-TIME PRI-AMP-BCK PRI-PULSE-BCK
2 005 000 000 0.00 0.00

LVL PULSE ROT PRI--RPM--BCK

2 OFF OFF 0.0 0.0

4. LEVEL 1 TIME needs to be set for the time it will take to rotate ONE

REVOLUTION at the selected LEVEL 1 PRI--RPM rate. The RPM rate is

usually set at a rate that the head is most frequently used at.

LEVEL 2 is added with ROTATION turned OFF. This is to allow the

operator time to see if 1 revolution was completed before the “Return to

Home” functions engages at the end of Sequence.

5. Create the appropriate Weld Schedule and connect the Weld Head to be

calibrated (as in section 5.7). Insure that it is safe to rotate the head and that

the rotor has been JOGGED to the open position. Call up the appropriate

schedule from the Library and press the sequence start. When the first level is

complete check that the rotor has made one revolution (do this before level 2

is complete). If it has not adjust the Trim Potentiometer on the weld head and

repeat until the head does make one revolution.