Arc Machines 207 User Manual

Page 61

Advertising
background image

MODEL 207A AND 207A-1

OPERATION MANUAL

Doc. No. 740044
Rev F

SECTION VII - CALIBRATION

7.2

CURRENT CALIBRATION

The M-207A contains components for measuring the actual amount of current.

Normal calibration is intended for adjusting the circuitry based on measuring

these devices.

True verification of current output for Quality Control purposes must be done

with an External Calibration Shunt that is calibrated by an independent agency

and controlled by a users QC or QA department. An external shunt adequate for

this use is sold as a M-207A option.

This procedure is written to include both calibration using the internal devices for

measuring and for using the external shunt option provided by AMI.

A weld schedule is required for calibration. The first time calibration is done it

will have to be CREATED. Step 1 below has a place for writing in the Weld #

when it is created.

1. Select Weld Schedule Number _______ and verify that it is programmed as

follows:

PRE-PURGE-POST UP-SLOPE-DOWN ROT--DLY

30 30 1.0 1.0 CW 0.0

LVL PULSE ROT PRI--RPM--BCK
1 OFF OFF 0.00 0.00

LEVEL 1

LVL TIME PRE-AMP-BCK PRI-PULSE-BCK
1 10 100 0 0.00 0.00

LVL PULSE ROT PRI--RPM--BCK
2 OFF OFF 0.00 0.00

LEVEL 2

LVL TIME PRE-AMP-BCK PRI-PULSE-BCK
2 15 10 0 0.00 0.00

The system is calibrated at 100 amps in level 1 and at 10 amps in level 2. To

give yourself enough time to check each value it is suggested that you make at

least 4 levels as above making all odd number levels 100 amp and all even

levels 10 amps.





7.2