CB-2 Automated Concrete Batching System Installation/Operation Manual

2.2

CB-2 Main Junction Block

The CB-2 main junction box provides access for outside power to be brought into the enclosure using two sets of

customer supplied 110V power - one for the 920i indicator and the other for the relays/plant control.
Figure 2-2 illustrates the 12 pin connector used plus the relays.

Figure 2-2. CB-2 AC Power Junction Block

Table 2-1 lists the pin connections located on the BOTTOM ROW of the terminal strip for power to the CB-2.

Figure 2-3. AC Power 12 Pin Connector as Shown in Detail from Figure 2-2 (above)

Bottom Row Pin Number

Function

1

Line 1, provides power to 920i

2

Neutral

3

4

5

Line 2, provides power to relays

6

Neutral

7

8

9

Ground

10

11

12

Table 2-1. CB-2 AC Power Junction Block Power Connections Into the Enclosure

Relay 1

R e l a y 2 A g g .
conveyor start

Relay 3

R e l a y 4 A i r
Compressor
start

1 2 p i n
c o n n e c t o r w /
pin 1 starting at
left and shown
in greater detail
i n F i g u r e 2 - 3
below.