2 front panel configuration, Front panel configuration – Rice Lake CB-2 Concrete Batch Controller Version 1.0 User Manual

Page 22

Advertising
background image

18

CB-2 Automated Concrete Batching System Installation/Operation Manual

Figure 3-1. iRev Hardware Configuration Display

To use

iRev

, do the following:

1. Install

iRev

on an IBM-compatible personal computer. See XX for detailed hardware and software

requirements.

2. With both indicator and PC powered off, connect the PC serial port to the RS-232 pins on the indicator

serial port.

3. Power up the PC and the indicator. Use the setup switch to place the indicator in setup mode.
4. Start the

iRev

program.

iRev

provides online help for each of its configuration displays. Parameter descriptions provided in this manual for

front panel configuration can also be used when configuring the indicator using

iRev

: The interface is different, but

the parameters set are the same.
See the 920i Installation and Operation Manual, PN 67887 for more information about using

iRev

to configure the

920i

.

3.1.2

Front Panel Configuration

Use the CONFIG submenu under the SCALES menu to configure A/D scales. For example, in an indicator with

a single-channel A/D card installed in Slot 1, the Scale Configuration display will show the A/D listed (

Slot 1

Channel 1

) under the

AVAILABLE A/D’s

column. Use the

left

navigation key to select the A/D, then press the center

softkey,

Add

. The A/D is then moved to the Associated A/D’s column. If no other A/D’s are listed in the

AVAILABLE A/D’s

column, the center softkey changes to

Done

, as shown in Figure 3-2. Press

Done

to exit the Scale

Configuration display.

Figure 3-2. Scale Configuration Display

Advertising