CB-2 Automated Concrete Batching System Installation/Operation Manual

2.0

Installation

This section explains the main junction box, load cell, digital I/O, and serial communications connections located

inside of the CB-2. The 920i HMI indicator is housed inside the CB-2 enclosure which is shown below in

Figure 2-1 along with examples of several other key component parts.

Figure 2-1. CB-2 Enclosure

Use a wrist strap to ground yourself and protect components from electrostatic discharge (ESD) when

working inside the indicator enclosure.

This unit uses double pole/neutral fusing which could create an electric shock hazard. Procedures

requiring work inside the indicator must be performed by qualified service personnel only.

The supply cord serves as the power disconnect for the

920i

. The power outlet supplying the indicator

must be installed near the unit and be easily accessible.

Expansion Board

Breakout Boards

Terminal Blocks

Relay Racks

Agg Conveyor and Air
Compressor Latching
Relay Circuits