CB-2 Automated Concrete Batching System Installation/Operation Manual

For units containing three load cells, the following table and diagram illustrate the load cell connectors used.

Figure 2-5. Terminal Blocks Load Cell Connection (Weighed Water Option)

The following table lists the load cell connections for a CB-2 automated concrete batching system that contains
three load cells.

Table 2-3. Load Cell Connectors for Units with Three Load Cells (Weighed Water)

Bottom Connector - Load Cells

Load Cell Connector

Pin Number

Signal

Load Cell 1
Aggregates

1

- EXE

2

+ EXE

3

- SEN

4

+ SEN

5

- SIG

6

+ SIG

Load Cell 2

Cement

7

- EXE

8

+ EXE

9

- SEN

10

+ SEN

11

- SIG

12

+ SIG

Load Cell 3

Water

13

- EXE

14

+ EXE

15

- SEN

16

+ SEN

17

- SIG

18

+ SIG

+SIG

- SIG

+EXC

-EXC

+SIG

-SIG

+EXC

-EXC

+SIG

-SIG

+EXC

-EXC

Pin 1

A g g r e g a t e
Side

Water Side

C e m e n t S i d e
(Middle)