Rice Lake CB-2 Concrete Batch Controller Version 1.0 User Manual
Page 12
8
CB-2 Automated Concrete Batching System Installation/Operation Manual
For units containing three load cells, the following table and diagram illustrate the load cell connectors used.
Figure 2-5. Terminal Blocks Load Cell Connection (Weighed Water Option)
The following table lists the load cell connections for a CB-2 automated concrete batching system that contains
three load cells.
Table 2-3. Load Cell Connectors for Units with Three Load Cells (Weighed Water)
Bottom Connector - Load Cells
Load Cell Connector
Pin Number
Signal
Load Cell 1
Aggregates
1
- EXE
2
+ EXE
3
- SEN
4
+ SEN
5
- SIG
6
+ SIG
Load Cell 2
Cement
7
- EXE
8
+ EXE
9
- SEN
10
+ SEN
11
- SIG
12
+ SIG
Load Cell 3
Water
13
- EXE
14
+ EXE
15
- SEN
16
+ SEN
17
- SIG
18
+ SIG
+SIG
- SIG
+EXC
-EXC
+SIG
-SIG
+EXC
-EXC
+SIG
-SIG
+EXC
-EXC
Pin 1
A g g r e g a t e
Side
Water Side
C e m e n t S i d e
(Middle)