Inspection and Start-Up Checklist 检查和启动检查清单

Handling and Installation 搬运和安装

1) Mount unit on solid, level surface.
2) Allow sufficient space for access to unit and accessories.
3) Provide proper electrical service.
4) Provide hot water to humidifier.
5) Install drain line with proper pitch.
6) Install ductwork, fittings and grilles properly.
7) Insulate all cold duct surfaces.
8) Do not obstruct airflow.

1)机组安装在坚实,平整的表面。

2)为机组和配件进入(维修)准备足够的空间。

3)提供适当的电力服务。

4)为加湿机提供热水。

5)排水管线安装适当的角度。

6)正常安装风管道,管件和格栅。

7)所有冷风管道表面应隔热绝缘。

8)不要阻碍通风。

Unit Start-up

机组启动

1) Conduct visual inspection.
2) Check all wiring connections.
3) Make sure all duct, grilles and panels are in place.
4) Start unit.
5) Check connections for air leaks and water leaks.
6) Check for excessive noise or vibration.
7) Check for operation of humidifier.

1)进行目视检查。

2)检查所有的接线方式。

3)确保所有的管道,格栅和面板到位。

4)启动机器。

5)检查是否有漏气和漏水的连接管道。

6)检查过多的噪音或振动。

7)检查加湿机运作。