Chapter 7

J - Electrical Inspection

1) Verify the proper input power, AC or DC, is properly installed
2) Use a meter to verify neutral, ground and hot are correct
3)

4)

Isolated from SCR and motor control circuits

Use a Common earth ground.

J

(a) Keep ground cable runs as short as possible
(b) Excessive ground cable runs can act as an antenna

for AC noise
(c) Install grounding straps around load cells to direct
static away from the load cell and directly to ground
(d) Install ground straps on the input and discharge

piping and the vessel to a common earth ground

J1

Verify the proper voltage

level has been supplied

J2

Apply power to the

controller only if supply

voltage is correct

1) Verify the front LEDS illuminate
2) Completes the initialization process
3) Reads the weight. This weight value will not be

correct if a calibration procedure was not performed

J3

Does the scale reflect

a weight change?

1) Read the NET weight
2) Send a TARE command to ZERO the NET weight

3) Apply weight to the vessel

DO NOT POWER UP THE CONTROLLER UNTIL

INPUT VOLTAGES CAN BE VERIFIED

(a) Does the weight increase and decrease in the

correct direction with the weight?
(b) Does the weight return to ZERO NET?
(c) The weight value will not be correct until a proper

calibration is complete

J4

Cabling

1) Use the load cell certificate, manuals or drawings to verify the

load cell color code. Input = Excitation, Output = Signal
2) Shielding
(a) Grounded only at the rate controller
(b) Continuous shield connection from the load cell cable

to the controller. Single point EMI/RFI drain
(c) Terminated but not grounded at the summing box
3) Sense lines installed?
(A) Jumpers or sense lines in the J1 connector?

(B) Sense lines must be installed for C2 or Softcal
calibration
4) Use IT TEST to verify readings

To Verify Proper Load Cell

Operations Go to

K