Figure 21. power connection – Interlogix UltraView PTZ Dome Series User Manual

Page 31

Advertising
background image

Chapter 3

Wiring

23

3. Connect the facility power cable (Figure 21). Use the provided 2-pin power terminal strip. If you are

using a heavier gauge cable, ensure that it is properly seated in the connector.

Figure 21. Power connection

When power is received by the housing board through the power connection, the housing board’s
diagnostic power LED will appear orange.

Advertising