Figure 30. removing the access cover, Figure 30 – Interlogix UltraView PTZ Dome Series User Manual

Page 49

Advertising
background image

41

Figure 30. Removing the access cover

4. Using the arm as a template, place it level against the mounting surface and mark the position of the

mounting holes, and if needed, the cable entry hole (Figure 31).

Figure 31. Marking the mounting and cable entry holes

5. Following all local codes, drill and prepare the mounting holes, and if needed, cut the cable entry hole.

6. Feed the cables through the cable entry hole in the mounting surface or through the conduit attached to

the opened conduit hole, and up through the arm.

Pull enough cable to make connections. You can always pull back unneeded length later.

Do not terminate the cables yet. Otherwise, they will not fit through the dust seal of the housing.

How many cables you pull depends upon how many video, data, and power cables you are
using. See

Wiring

on page 19.

7. Securely fasten the arm to the mounting surface with the appropriate fasteners (Figure 32). Again,

ensure that it is level.

Advertising