Tools for installation – Conair 100 User Manual

Page 119

Advertising
background image

I n s t a l l i n g t h e M D C

The MDC was designed to be mobile. So every time you move the MDC, you will
need to mount the vacuum receiver, connect the main power source, and connect a
water source for the optional aftercooler. Phasing of electric power should be
consistant between locations.

The first time you install the MDC:

1

1

Move the MDC to the processing area. Lock the wheels on the drying cart.

2

2

Mount the vacuum receiver on the feed throat. Push the vacuum receiver
onto the mounting bracket.

3

Connect the conveying lines.

4

Connect the RTD probe.

5

Connect the demand sensor to the electrical enclosure of the dryer.

6

Connect the main power source.

7

Connect a source of water for the optional aftercooler.

Conveying lines

Demand
sensor

Vacuum receiver

Tools for
installation:

❒ Phillips screwdriver
❒ Flathead screwdriver

Central

When configured as
a central dryer, the
MDC option is not
available.

A p p e n d i x l

G - 9

Advertising
This manual is related to the following products:

25, 50, 7.5, 15