Central – Conair 100 User Manual

Page 57

Advertising
background image

To S t a r t D r y i n g

1

Make sure there is material in the hopper.

2

Turn on the main power to the dryer

.

Make sure the dryer’s

disconnect dial is in the ON position. This powers up the con-
trol and the display lights will illuminate.

3

Set the drying temperature. Use the Scroll
button to get to the Process Temp function.
Press the Adjust Setpoint ▲ or

Jbuttons to

select the temperature.

(continued)

Set Point

Actual

1 Process Temp.
2 Regen. Temp.
3 Return Air Temp.
4 Auto Start
5 Load Time (MDC)
6 Activate Setback Temp.
7 Setback Temp.(Process)
8 Setback Load Rate
9 PM1 Dewpoint

Shutdown Alarms
A1 Process High Temp.
A2 Process Loop Break
A3 Process Heater High Temp.
A4 Regen. Heater High Temp.
A5 Carousel Index Too Long
A6 Carousel Index Failure
A7 Return Air High Temp.

Passive Alarms
P1 Process Temp. Deviation
P3 Regen. Temp. Deviation
P5 Return Air High Temp.

Auto Start

Desiccant Indexing

Set-Back Temp.

Process Blower

Process Pressure

Process Heater

Regen. Blower

Regen. Pressure

Regen. Heater

4

Opera

tion

Central

When configured as a central dryer, the drying temperature can
not be set since there is no process heater in the system.

O p e r a t i o n l

4 - 1 7

Advertising
This manual is related to the following products:

25, 50, 7.5, 15