Conair 100 User Manual

Page 31

Advertising
background image

I n s t a l l a t i o n l

3 - 9

3

Description

M o u n t i n g t h e H o p p e r

CAUTION: To prevent accident and injury, lift the empty hopper onto the throat of

the processing machine using a hoist and the lifting lugs provided. Also lift the dryer from
the shipping container using a hoist and the lifting lugs provided.

1

Lift the hopper onto the throat. Lift the hopper with a hoist, using the lifting
lugs provided. Make sure you align the bolt holes in the throat with the bolt
holes on the discharge assembly.

2

Bolt the hopper to the throat of
the machine.
Using four 3/8 in.-16
(M 10) self-locking bolts, fasten
the support frame, discharge, and
slide gate to the throat. The bolts
must be long enough to reach at
least 1/2 in. (1.25 cm) into the
mounting adapter or processing
machine throat, after passing
through the discharge and slide
gate.

P o s i t i o n i n g t h e
D r y e r o n t h e
F l o o r

1

Lift the dryer from the shipping
container
using a hoist and the lifting
lugs provided.

2

Position the dryer on the floor near
the processing machine. Make sure
the location allows for the connection
of all hoses.

Advertising
This manual is related to the following products:

25, 50, 7.5, 15