Conair 100 User Manual

Page 121

Advertising
background image

C o n n e c t i n g t h e R T D P r o b e

See “Connecting the RTD Probe” page 3-16

C o n n e c t i n g t h e D e m a n d S e n s o r

The capacitive demand sensor monitors the level of material in the viewing cham-
ber of the vacuum receiver when the MDC is conveying. The sensor signals the
MDC control to start the conveying blower whenever the level of material drops
below the amount that you want to maintain at the feed throat.

1

Plug the sensor cable into the multi-pin connector on the side of the MDC
electrical enclosure.

C o n n e c t i n g t h e M a i n P o w e r

See “Connecting the Main Power” page 3-10

C o n n e c t i n g t h e W a t e r H o s e s

See “Connecting Water Hoses” page 3-15

TIP: Prevent damage to the

demand sensor cable by

attaching it to the return air

conveying line with a wire tie.

Do not tie the cable to the

smaller-diameter material

conveying line. Material

passing through the line will

generate static electricity and

noise in nearby electrical

cables.

Central

When configured as
a central dryer, the
MDC option is not
available.

A p p e n d i x l

G - 1 1

Advertising
This manual is related to the following products:

25, 50, 7.5, 15