ADC AD-78 User Manual

Page 38

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Although the steam damper operation was tested and adjusted prior to shipping at 80 PSI, steam damper
operation must be checked before the dryer is put into operation. Refer to page 36 or instructions to check
steam damper operation. If steam damper adjustment is necessary, locate the flow control valve and make
the necessary adjustments as noted below.

5. Steam Damper Air Piston (Flow Control) Operation Adjustment

NOTE:

TURNING KNOB ON FLOW

CONTROL CLOCKWISE WILL
RESTRICT AIR FLOW. TURNING
COUNTER-CLOCKWISE WILL
ALLOW HIGHER AIR FLOW.

34

Advertising