3 install a new nudam to a existing network – ADLINK ND-6054 User Manual

Page 57

Advertising
background image

Initializtion & Installation

49

2.3 Install a New NuDAM to a Existing Network

2.3.1 Equipments for Install a New Module

A existing NuDAM network

New NuDAM modules.

Power supply (+10 to +30 V

DC

)

2.3.2 Installing

Procedures

1. Configure the new NuDAM module according to the initialization

procedure in section 2.2.

2. The baud rate and check-sum status of the new module must be

identity with the existing RS-485 network. The address ID must not
be conflict with other NuDAM modules on the network.

3. Power off the NuDAM power supply of the existing RS-485 network.

4. Power off the host computer.

5. Wire the power lines for the new NuDAM with the existing network.

Be careful about the signal polarity as wiring.

6. Wire the RS-485 data lines for the new NuDAM with the existing

network. Be careful about the signal polarity as wiring.

7. Wire to the input or output devices. Refer to section 2.4 for

illustrations.

8. Power on the host computer.

9. Power on the NuDAM local power supply.

10.

Use the NuDAM administration utility to check entire network.

Advertising