5.2 Boiler Sizing

• Verify you have selected boiler with proper capacity

before continuing installation. AHRI Rating of selected

boiler should be greater than or equal to calculated

peak heating load (heat loss) for the building or area(s)

served by boiler and associated hot water heating

systems. See Sea Level Ratings - Natural and Propane

Gases” Section 4.

• Heat loss calculations should be based on approved

industry methods.

5.3 Considerations for Boiler Location

Before selecting boiler location consider following.

• Supplied with correct type of gas (natural gas or

propane).

• Connected to suitable combustion air intake piping

system to supply correct amounts of fresh (outdoor) air

for combustion (15’ minimum equivalent length/100’

maximum equivalent length).

• Connected to suitable venting system. (15’ minimum

equivalent length/100’ maximum equivalent length).

• Connected to suitable hot water heating system.
• Supplied with suitable electrical supply for all boiler

motors and controls.

• Connected to properly located thermostat or operating

control (not included with boiler).

WARNING

Fire hazard. Do not install on carpeting. Failure to

follow these instructions could result in death or

serious injury.

!

• Placed on level surface (must NOT be installed on

carpeting).

• Pitch condensate drain line down to floor drain or

external condensate pump with reservoir at ¼” per foot

(wood frame or blocks may be used to raise boiler).

5.1 Before Boiler Installation
1.

Boiler is equipped for residential installations. If

used for commercial applications, additional code

requirements must be adhered to for installation. This

may require additional controls including but not limited

to a low water cut off, a manual reset high temperature

limit, and wiring and/or piping modifications.

2.

Never vent products of combustion from this boiler to

enclosed space. Always vent to outdoors. Never vent to

another room or to inside building.

3.

Keep boiler area clean of debris and free of combustible

and flammable materials.

4.

Proper through wall or through roof combustion venting

shall be in accordance with materials and methods

described in this manual. Installation must comply with

local codes.