Martin Christ Beta 2-8 LSCplus User Manual

Page 94

Advertising
background image

Beta 1-8 LSC&
Beta 2-8 LSC&

11 Appendix

94

Version 04/2013, Rev. 1.1 of 16/12/2013 • sb

Translation of the original operating manual

screw


Fig. 80: Rear view of the

freeze-dryer

1

Status line

2 Set process values
3 Button "Set values:

view/edit"

4 Actual values of the

current process

5 Button "Tools"
6 Button "Schematic

system diagram"

7 Button "Process and

equipment messages"

8 Button "Operating

mode: select/start"

9 Button "Stop"

Fig. 81:

LSCplus user interface


Step-by-step instructions – shelf drying
1 Freeze the sample separately, e.g. in a deep-freeze.

NOTE

Ensure that the layer thickness of 1 to 2 cm is not exceeded, since
otherwise the drying time needs to be extended.


2 Check the ice condenser chamber and ensure that it is completely free

from water residues.

3 Close the condensate drain valve and install the base plate.
4 Switch the unit on 20 to 30 minutes prior to the start of the drying

process in order to let the vacuum pump warm up.

5 Place the plate rack on the base plate.
6 Transport the frozen samples as quickly as possible from the deep-

freeze to the freeze-dryer and place them on the shelves.

NOTE

Recommendation: Store the product vessels on the aluminium shelves or,
if possible, the entire rack with the shelves in the deep- freeze. The
advantage is that due to the higher cold storage capacity of the aluminium
material, the product will remain frozen for a longer period of time so that
the sample will not thaw.


7

nstall the drying chamber. Prior to doing so, check whether the O-ring

is completely free of dirt particles. The ground-in stopper of the acrylic
glass bell must be greased with high-vacuum grease.

8 Ensure that all of the valves of the acrylic glass bell are closed.
9 Ensure that the aeration valve is closed.
10 Ensure that the condensate drain valve is closed.