2 connections, 1 gpib connection, Connections – AMETEK SLH Series RevC User Manual

Page 27

Advertising
background image

Sorensen SLH-Series DC High Power Electronic Load

Installation

2.2

CONNECTIONS

CAUTION: PREVENT DAMAGE TO THE LOAD.

Do NOT apply voltage or current with

power switched OFF. Turn ON the power switch to the load PRIOR to applying voltage or
current to the input terminals (i.e., before turning on the power supply under test).

2.2.1 GPIB

Connection

The GPIB connector on the rear panel connects the SLH-series high power load to the
controller and to other GPIB devices. A GPIB system can be connected in any configuration
(star, linear, or both), with the following two provisions:

1. There are no more than 15 devices, including the controller.

2. The maximum length of all cables combined is 20 meters, calculated at 2 meters times

the number of devices connected.

Please ensure that the lock screws are firmly hand-tightened; use a screwdriver only for the
removal of screws.

Figure 2-3 shows the rear panel of SLH-series high power load, the GPIB connector and
GPIB address setting switch is located on the rear panel of SLH-series high power load. The
initial GPIB address of the SLH-series high power load is factory set to address 05.


Figure 2-3 SLH-Series High Power Load Rear Panel

GPIB Address Setting:
To set the GPIB address, simultaneously press the STATE 4+STATE 5 keys on the front panel. Press
UP or DOWN on the BANK keys to select the address number (0-31), press STATE 2 to exit GPIB
address setting mode.

M540074-01

Rev C

2-3

Advertising