Seaward 300 PrimeTest User Manual

Page 73

Advertising
background image

PrimeTest 300

Operating Instructions

- 72 -

Similarly, if the last reading is greater than the Limit, a
Fail result is recorded. This is indicated by a large cross
next to the measurement field as shown below.

If the Earth Continuity test results in a Fail and the On
Test Failure
is set to End Test the sequence is
terminated.

Note: On Test Failure is set in User Options Test

Options On Test Failure.

If the Earth Continuity test results in a Fail and the On
Test Failure
is set to Fail Menu the display is as shown
below.

The earth continuity test can be restarted by simply
pressing OK (F4) to select Restart Test.

Advertising