Installation

3-1 Work Rules

The installation, operation, and maintenance of this equipment
must be conducted in accordance with all applicable work and
safety codes for the installation location. This may include, but is
not limited to OSHA, NEC, CSA, SPI, and any other local,
national, and international regulations.

;

Read and follow these operating instructions when installing,

operating, and maintaining this equipment. If the instructions
become damaged or unreadable, additional copies are available
from AEC, Inc.

;

Only qualified personnel familiar with this equipment should

work with this system.

;

Work only with approved tools and devices.

;

Disconnect and lock out power while working on this

equipment.

3-2 Tools and Equipment Needed

These tools and equipment are necessary for installation:

;

Hand tools.

;

Wire, conduit, and fittings for wiring runs.

;

Anchor bolts with nuts and washers or red head-type anchors.

3-3 Installing the VacTrac Control Panel

Note: Before you mount the panel, consider how you run wiring

to the vacuum hoppers, the filter chamber atmospheric
valve (if so equipped) and the pump motor starter(s),
vacuum switch(es), and vent valve(s).