Rack installation, Power supply, Installation tools – H3C Technologies H3C SecPath U200-A U200-M U200-S User Manual

Page 20: Accessories

Advertising
background image

11

Install a lightning protector at the input end of the power supply to enhance lightning protection

capability. For how to install a lightning protector, see "

Connecting the AC power supply to a

power strip with lightning protection

."

Rack installation

Reserve at least 1 m (3.28 ft) of clearance between the rack and walls or other UTM devices.

Reserve at least 10 cm (3.94 in) of clearance at the air inlet and exhaust vents for ventilation.

The equipment room is at least 3 m (9.84 ft) high and an air conditioner is installed.

Power supply

Make sure the power source of the installation site is steady and can satisfy the input requirements of

the power modules and parameters such as rated voltage. For power module specifications, see "

Power

input

."

Installation tools

The tools in the table may be used for installing the UTM device. Prepare them yourself.

Flat-blade
screwdriver

Phillips screwdriver Needle-nose pliers

Wire-stripping
pliers

Diagonal pliers

RJ-45 crimping
pliers

Marker Multimeter

Network cable
tester

Hot air blowing
gun

Accessories

Console cable (supplied
with UTM device)

Grounding cable
(supplied with UTM

device)

U200-A and U200-M
front mounting brackets
(supplied with UTM

device)

U200-S mounting
brackets (supplied with

UTM device)

 

Advertising