48

Series 7400 Single Phase 1+N UPS

Carry out the following checks from the mimic panel and log the

results:

1. Measure and record the battery float charge voltage.

2. Measure and record the battery charge current.

3. Measure and record the UPS output voltage on all three

phases.

4. Measure and record the UPS output line currents. If these are

significantly different from the values previously logged then, if

possible, record the size, type and location of any additional
load connected to the UPS supply since the previous

inspection. This type of information could prove useful to the

troubleshooting engineer should a problem occur.

If any of the above indications differ greatly from the previously

logged values for no apparent reason then you should contact
the Customer Service & Support Department at the address

given at the front of this manual for advice.


The equipment should be thoroughly cleaned and the following

checks carried out annually. This entails working inside the

equipment in regions containing hazardous voltages.

A manufacturer-trained engineer is fully aware of the hazards

concerned and will carry out this procedure with the load

connected to the maintenance bypass supply; however if the
customer decides to carry out this service procedure himself it is

imperative that the UPS be totally shut down and isolated from the

input mains supply and bypass supplies and batteries using the
procedure given below. We therefore strongly recommend that the

annual service is carried out by trained personnel.


1. Carry out the weekly checks detailed above.

2. Shut down the UPS following the recommended operating

procedure.

3. Isolate the UPS input mains supply externally (also the bypass

supply if a split bypass is in use) and isolate the battery.

4. Ensure that the UPS is totally powered down by checking for

voltage at the mains input terminals, battery connection
terminals, and output terminals (and bypass mains input

terminals in a split bypass configuration).

5. Gain full access to the UPS interior by opening its internal

hinged safety panel.


5.3.2 Weekly Checks

5.3.3 Annual Service

Advertising