C 9.92, Operating instructions, Maintenance during the initial period of operation – Holder C 9.92 H User Manual

Page 169: Maintenance after the first 50 service hours

Advertising
background image

Operating Instructions

153 146

167

C 9.92

Maintenance during the initial period
of operation

The following services and inspections are due during the
initial period of operation:

Maintenance after the first 50 service hours
Maintenance after the first 500 service hours

Maintenance after the first 50 service
hours

Checking the engine for leaks

-

Raise the dumping subframe (dump body*) and
secure it against accidental lowering.

-

Check the engine and attachments for leaks.

Checking air tubes and air hoses for leaks

-

Check the air tubes and air hoses (1) for damage and
leaks.

Bild_S 990_033

1

* Option

Advertising