C 9.92, Operating instructions, Operating the attachments – Holder C 9.92 H User Manual

Page 87

Advertising
background image

Operating Instructions

153 146

85

C 9.92

Operating the attachments

Adjusting the upper link slide and upper link

The upper link slides are height-adjustable. The required
height depends on your attachment.

1 Upper link bracket
2 Locking pin
3 Upper link pin
4 Upper link slide
5 Height adjustment lever

-

Raise the height adjustment lever (5).

-

Slide the upper link slide (4) into one of the 4 possible
positions.

-

Release the height adjustment lever to engage the
upper link bracket.

-

Pull the spring cotter (2) from the pin (3) and pull the
pin out to the side.

-

Adjust the upper link arm (8) to a suitable length (by
screwing the sleeve in or out) and secure the top link
with the locking lever (7).

ATTENTION
Both threads must be screwed in equally far.

-

Install the eye of the upper link arm on the pin and
secure the pin again with the spring cotter.

6

9

7

8

Bild_C992H_031

1

2

3

4

5

Advertising