Requirements for Installation Environment

29

2.1 Requirements for Installation

Environment

Before installing the switch, please check the following:

Make sure that the switch and all the other options shown in this document are available for installation.

All the cables comply with the specifications of the interface connectors.

Warning

Do not connect cables to interface connectors other than those adaptable to the connector’s
specifications.

Install the product under the following environmental conditions.

2.1.1

Installation Requirements

Caution

Install the product under the following conditions. Using the product outside the required
environment may cause failure of the product.

Temperature and Humidity Requirements

Power Requirements

Reference "1.1.1 Parts List" (pg.18)

Temperature (degrees C)

Humidity (%RH)

Operation

0 to 40

15 to 85

Non-operation

0 to 50

8 to 90

Item

Requirements

Voltage

AC90V-264V

Frequency

50Hz / 60Hz +2%, -4%

Ground

Separate ground wire from air conditioners and building, and D-class grounding
with ground resistance of 100

or less.

Electricity

AC input more than 128W

Inrush Current

Maximum 30A
Ensure installation environment that avoids lowering voltage to power supply
equipment at the time of power-on due to the inrush current, although there’s no
impact from the inrush current in normal use.