Installing/removing the ffx-raid controller module – Fujitsu Siemens Computers S60 User Manual

Page 60

Advertising
background image

52

U41221-J-Z156-1-74

The FFx-RAID Controller Module

Plug-in Board Modules

The individual DIP switch positions ON have the following function:

8.1.3

Installing/removing the FFx-RAID controller
module

V

CAUTION!

Observe the notes on safety and the information on electrostatic
sensitive device labeling in chapter “Important Notes” on page 7.

The FFx-RAID controller module can be installed and removed while the
subsystem is running provided that the configuration involved is a dual-active
configuration (two modules with dual-active configuration have been installed)
and the

MultiPath

software is active. If one FFx-RAID controller module is

removed, the second module automatically takes over its function (hot swap).

V

CAUTION!

As condition for a hot swap action the replaced FFx-RAID controller
modules (FFx-RAID controller) must have the same firmware version
and the same cache memory size.

DIP switch Function

J1

ON Manufactory Diagnosis Mode activated: status indicator LEDs

(red, green, yellow) for the FFx-RAID controller flash 0.5 sec.

J2

ON Debug Mode

J3

ON Disable HSSDC NODE

J4

ON Disable GBIC NODE

K1

ON Conservative Cache active

K2

ON Enable delayed FFx-RAID controller power ON (delay ca. 17 sec.)

K3

ON Enable/Reset FFx-RAID controller from I2C bus active

K4

ON Multi Frame Mode: node ON/OFF after 4 consecutive erroneous

or error-free frames

Table 13: DIP Switches: Functions

Advertising