Installation, Installation steps, 10 installation – Fujitsu Siemens Computers S60 User Manual

Page 69: 1 installation steps

Advertising
background image

U41221-J-Z156-1-74

61

10

Installation

10.1

Installation Steps

V

CAUTION!

The storage subsystem should not be subjected to any extreme environ-
mental conditions (see section “Technical Data” on page 4). Protect it
from dust, moisture and heat.

The storage subsystem must be acclimatized in its operating
environment for an acclimatization time.

The following installation steps are described in detail in other sections of this
chapter:

Unpacking the storage subsystem.

Setting up the floorstand model or mounting the rack model into the rack.

Cabling the storage subsystem (see chapter “Connections” on page 57).

Setting the desired system parameters.

Connecting the storage subsystem to the mains voltage (see section “Mains
Connection” on page 58 or s
ection “Mains Connection with Phase Redun-
dancy” on page 59).

Switching ON the storage subsystem.

Temperature difference (°C)

(operating environment/outside)

Minimum acclimatization time

(hours)

5

3

10

5

15

7

20

8

25

9

30

10

Table 14: Acclimatization Time

Advertising