Installation – FireplaceXtrordinair 36 DV EFIII User Manual

Page 18

Advertising
background image

1 8

Installation

(for qualified installers only)

Travis Industries

4040708

1 0 0 - 0 1 1 6 0

Vent Installation

In addition to the requirements below, follow the requirements provided with the vent.

Use a firestop whenever
passing through a ceiling

Vertical Termination

Use a roof flashing and storm collar
whenever passing through the roof

Use a support box
on exposed vent

Vertical Vent

Requirements

Use a firestop whenever
passing through a wall

Horizontal Termination

Maintain a minimum 1" clearance (2" in
some cases - see "Clearances") from
vent to any combustible

Minimum
Framing for
wall thimble

Horizontal Vent

Requirements

Minimum framing
for fire stop

Maintain a minimum 1"
clearance from vent to
any combustible

8-5/8"

or

10"

8-5/8"

or

10"

Slide the vent sections together and turn 1/4 turn until the sections lock in
place.

Screws are not required to secure the vent. However, three screws may be
used to secure vent sections together if desired.

High temperature sealant is recommended at the appliance starter section
connection (use high-temperature silicone or Mill-Pac®).

If disassembly is required, at time of re-assembly check to see if the vent
creates a tight fit. If it does not, apply high temperature sealant to the joints of
the affected sections.

Horizontal sections require a 1/4" rise every 12" of travel

Horizontal sections require non-combustible support every three feet (e.g.: plumbing tape)

Advertising