Figure 6-18 – Intel SGI Altix 450 User Manual

Page 154

Advertising
background image

132

007-4857-002

6: Maintenance and Upgrade Procedures

c.

Mount the card in the carrier, (see Figure 6-18) and ensure the following occurs:

– The card connectors protrude through the bulkhead where the metal filler plate was
located.

– The edge connectors fit between the bottom guides of the carrier.

– The top of the card fits under the clips on the guide bar.

d.

Tighten the three screws on the guide bar. Skip step 6 and proceed to step 7.

Figure 6-18

Mounting Card in Carrier

Guides

Bulkhead

Clips

Advertising