Installing a Rack . . . . . . . . . . . . . . . . . . . . . . . . 6

Preinstallation Activities . . . . . . . . . . . . . . . . . . . . 6

Site Plan Verification . . . . . . . . . . . . . . . . . . . . 6

Tools Required . . . . . . . . . . . . . . . . . . . . . . 7

Power Receptacle Verification . . . . . . . . . . . . . . . . . . 8

Unloading and Moving System Equipment . . . . . . . . . . . . . . . . 12

Unloading the Equipment from the Truck . . . . . . . . . . . . . . . 12

Inspecting the Shipping Crate . . . . . . . . . . . . . . . . . . 14

Transporting the Shipping Crate . . . . . . . . . . . . . . . . . 15

Removing a Short Rack from the Shipping Crate . . . . . . . . . . . . . . 16

Unpacking and Installing the Tall Rack . . . . . . . . . . . . . . . . . 18

Positioning and Leveling Racks . . . . . . . . . . . . . . . . . . . 21

Unpacking and Inspecting Modules . . . . . . . . . . . . . . . . . . . 22

Installing the IRUs in a Rack. . . . . . . . . . . . . . . . . . . . . 24

Determining Space Requirements . . . . . . . . . . . . . . . . . . 24

Determining Where to Attach Rails in a Rack . . . . . . . . . . . . . . . 25

Rackmounting IRUs with Shelf Rails . . . . . . . . . . . . . . . . . 26

Removing a Rackmounted IRU Module . . . . . . . . . . . . . . . . 28

NUMAlink Cabling the System IRUs . . . . . . . . . . . . . . . . . . 29

Cabling the System IRUs to a Power Source . . . . . . . . . . . . . . . . 31

Connecting an IRU Module to a Power Source (No Rack) . . . . . . . . . . . . 31

Connecting System Modules to a Rack Power Source . . . . . . . . . . . . . 34

Connecting the System Console . . . . . . . . . . . . . . . . . . . . 36

Operating Your System . . . . . . . . . . . . . . . . . . . . . . 38

Powering the System On and Off . . . . . . . . . . . . . . . . . . 38

Preparing to Power On . . . . . . . . . . . . . . . . . . . . 38

Powering On With Optional System Console and L1/L2 Controller . . . . . . . . 39

Powering On Manually or With L1 Console . . . . . . . . . . . . . . 41

Powering Off at the System Console . . . . . . . . . . . . . . . . 42

Powering Off Manually. . . . . . . . . . . . . . . . . . . . 43

L1 Front Panel Controls . . . . . . . . . . . . . . . . . . . . . 44

Operating the L1 Controller . . . . . . . . . . . . . . . . . . . . 45