Pack components for shipment” on, Pack components for shipment – Juniper Networks M5 User Manual

Page 189

Advertising
background image

Pack Components for Shipment

6.

Remove the chassis from the rack:

If you are using a mechanical lift, place the lift platform under the chassis,
unscrew and remove the mounting screws from the rack, and move the chassis
to the shipping box.

If you are not using a mechanical lift and the chassis weight is fully supported by a
shelf or another chassis, unscrew and remove the mounting screws from the rack.
Two people can then lift the chassis and move it to the shipping box.

If you are not using a mechanical lift and the chassis weight is not fully supported
by a shelf or another chassis, two people should grasp the router while a third
person unscrews and removes the mounting screws from the rack. The two lifters
can then move the chassis to the shipping box.

7.

Place the chassis in the shipping box.

8.

Replace the packing foam on top of the chassis.

9.

Replace the accessory box on top of the packing foam.

10. Securely tape the box closed.

Pack Components for Shipment

To pack and ship individual router components, follow these guidelines:

Protect the component with enough packing material to prevent movement inside the
carton. Use the original shipping materials if they are available.

Place individual boards in electrostatic bags.

Do not stack components.

Return the Router or Its Components

169

Advertising
This manual is related to the following products:

M10