Juniper Networks M5 User Manual
Page 73
Advertising

Site Preparation Checklist
Item or Task
Performed
By
Date
Notes
Select the type of rack.
Plan rack location, including required space
clearances.
Secure rack to floor and building structure.
Acquire cables and connectors.
Locate sites for connection of system
grounding.
Calculate power budget and power margin.
Prepare for Router Installation
53
Advertising
This manual is related to the following products: