Verifying the upgrade, Verifying the upgrade -8, Figure 9-3 – Juniper Networks E-Series User Manual

Page 114

Advertising
background image

CHAPTER 9
Maintaining E-Series Routers

9-8

Figure 9-3 SODIMM sockets on the SRP-40 module

2

Insert a SODIMM from the upgrade kit at an angle of
approximately 45 degrees into an empty ceramic connector, so that
the notch in the long gold edge of the SODIMM aligns with the
notch in the connector.

The notch on the long gold edge will no longer be visible when the
SODIMM is pressed in far enough.

3

Press the top surface downward

into the socket until the socket spring

snaps into place and holds it.

4

Repeat steps 2 through 3 with the other SODIMM.

5

Repeat steps

1

through 4 for the other SRP module, if present.

Verifying the Upgrade

To verify that the upgrade is complete:

1

Place the SRP modules in the chassis.

The SRP modules will reboot.

2

Close the ejector handles and tighten the thumbscrews.

3

Issue the

show hardware command, and verify that the display

indicates that the correct amount of memory is present.

SODIMM

Empty SODIMM socket

g013452

Advertising