Sunway NT 10000 User Manual

Page 64

Advertising
background image

148

Error

Errors 020 to 022

Insulation fault

Errors 023 to 025

DC injection

Error 026

Isolated opera-

tion

Causes

During start-up, the Solar

Inverter has detected an

insulation fault in the PV

system.

The Solar Inverter has detec-

ted a DC share > 1 A in the

grid current.

Failure of one or more of

the grid phases L1, L2, or L3.

The position of the indivi-

dual phase conductors in

relation to each other has

moved beyond the admis-

sible tolerances.

Remedies

Check your PV system for insulation

faults.

Restart the Solar Inverter. Should the

fault still occur, please call the technical

hotline. The phone number is on the

back of the user manual.

Check the grid phases L1, L2, and L3.

Ask your power supply company about

the stability and design of the grid.

BP13370_NT_10000_englisch 23.11.2005 17:40 Uhr Seite 64

Advertising