Figure 2-11, Figure 2-12 – KVH Industries TracVision G8 User Manual

Page 32

Advertising
background image

14. Place the antenna baseplate over the mounting holes

drilled in the foundation, ensuring the connectors face the
stern.

15. At each of the four baseplate mounting holes, place an

M10 lock washer and flat washer on an M10 bolt and
insert the bolt into the hole from below, as shown in
Figure 2-11. Tighten all four bolts securely until the four
feet are bottomed against the mounting surface.

Figure 2-11

Bolting the Antenna Unit to the Deck (Side View)

16. Unfasten the tie-wrap securing the antenna frame to the

sensor bracket (release the tab using a flat-head screwdriver).
Save the tie-wrap in case the antenna needs to be
reshipped someday.

Figure 2-12

Antenna Frame Shipping Restraint

54-0198

30

TracVision G8 Owner’s Manual - Guide to Technical Information

M10 x 50 mm Bolt

Antenna Unit Base

Deck

M10 Flat Washer

M10 Lock Washer

10 mm max.

Tie-wrap

Sensor

Bracket

Frame

Ensure the mounting screws do not
extend further than 0.4" (10 mm)
into the antenna baseplate.
Inserting the screws any further will
damage the antenna.

Advertising