Figure 5-6, Pcb module connectors – KVH Industries TracVision G8 User Manual

Page 96

Advertising
background image

7. Reconnect the cables that you removed in Step 4. Be

sure to reconnect all cables in their proper positions.
Figure 5-6 shows the proper connector assignments.

Figure 5-6

PCB Module Connectors

8. Apply power to the antenna unit.

9. Using the PC connected to the maintenance port, type

HALT then press Enter.

10. Type DEBUGON then press Enter.

11. Type =TVG8SS then press Enter.

12. Type =SERNUM,<serial number>, where <serial

number> = the serial number you recorded in Step 2.
Then press Enter.

13. Type ZAP then press Enter to restart/reinitialize the

system.

14. Calibrate the antenna gyros as explained in “Calibrating

the Gyros” on page 105.

15. Reinstall your selected satellites as explained in Section 2.7,

“Installing Satellites Using the MCU,” on page 42.

54-0198

100

TracVision G8 Owner’s Manual - Guide to Technical Information

POWER

ELEVATION GYRO

INTERNAL SENSOR

SKEW MOTOR

ELEVATION & AZIMUTH MOTORS

AZIMUTH/ROLL GYRO

LIMIT SWITCHES

FUSE

Limit

Switches

Internal

Sensor

Azimuth

Gyro

Elevation

Gyro

Power

Elevation & Azimuth

Motors

Skew Motor

Fuse

To LNB

BOTTOM

TOP

RF1 From IRD

Advertising