Figure 5-6, Pcb module connectors – KVH Industries TracVision G8 User Manual
Page 96

7. Reconnect the cables that you removed in Step 4. Be
sure to reconnect all cables in their proper positions.
Figure 5-6 shows the proper connector assignments.
Figure 5-6
PCB Module Connectors
8. Apply power to the antenna unit.
9. Using the PC connected to the maintenance port, type
HALT then press Enter.
10. Type DEBUGON then press Enter.
11. Type =TVG8SS then press Enter.
12. Type =SERNUM,<serial number>, where <serial
number> = the serial number you recorded in Step 2.
Then press Enter.
13. Type ZAP then press Enter to restart/reinitialize the
system.
14. Calibrate the antenna gyros as explained in “Calibrating
the Gyros” on page 105.
15. Reinstall your selected satellites as explained in Section 2.7,
“Installing Satellites Using the MCU,” on page 42.
54-0198
100
TracVision G8 Owner’s Manual - Guide to Technical Information
POWER
ELEVATION GYRO
INTERNAL SENSOR
SKEW MOTOR
ELEVATION & AZIMUTH MOTORS
AZIMUTH/ROLL GYRO
LIMIT SWITCHES
FUSE
Limit
Switches
Internal
Sensor
Azimuth
Gyro
Elevation
Gyro
Power
Elevation & Azimuth
Motors
Skew Motor
Fuse
To LNB
BOTTOM
TOP
RF1 From IRD