Instrument setup for remote strain measurements, Preparing the vt1422a for installation, Overview – VXI VT1422A User Manual

Page 60: Preparing the vt1422a for installation overview

Advertising
background image

58 Programming the VT1422A & VT1529A/B for Remote Strain Measurement

Chapter 3

Instrument Setup for Remote Strain Measurements

This section involves:

Preparing the VT1422A for installation into a VXIbus Mainframe

Preparing the VT1529A/B for use

Connecting the VT1422A to VT1529A/B Remote Strain Completion

units.

Connecting Excitation power supplies to the VT1529A/B

Connecting strain bridges to the VT1529A/B

Preparing the

VT1422A for

Installation

The VT1422A requires VT1539A SCPs to control Remote Signal
Conditioning Units like the VT1529A/B Remote Strain Conditioning Unit.
Chapter 1 “Getting Started” covers everything which is needs to be done
before installing the VT1422A in its mainframe. This includes switch settings
and SCP installation. After performing the operations in Chapter 1, return
here for Remote Strain specific operations.

Overview

Before getting into the specifics of configuring a Remote Strain Measuring
System, it might be helpful to see the overall set up. Figure 3-1 shows the
components and connections of a remote strain measuring system. The
circled letters identify connections that will be referenced in later sections.

Figure 3-1. Components of the Remote Strain Measuring System

Each VT1422A with VT1539A SCPs

and VT1529A/B Remote Strain Units

can support up to 512 strain gages

VT1539A

SCP (Up to 8)

VT1529A/B

VT1529A/B

VT1422A Multifunction

DAC Module shown with

an Option 001 RJ-45

Connector Module

Up to 4 excitation supplies

B

C

A

Up to 32 strain

gages

Up to four excitation supplies

Up

to

1

6

V

T

15

29

A/Bs

Up to 32 strain

gages

A

Advertising
This manual is related to the following products: