Preparing the vertical drive (continued) – Grain Systems Unload Augers PNEG-1556 User Manual
Page 11
Advertising
3. Installation
PNEG-1556 8", 10" and 12" Commercial Vertical Drive Unit - Dual Drive
11
Preparing the Vertical Drive (Continued)
D. Attach the two (2) leg support brackets to the mounting bracket pivot band using two (2)
3/4" x 4-1/2" hex bolts and nylock nuts.
E. Attach the two (2) outer support legs to the leg support brackets using two (2) 1/2" x 1-1/4" hex bolts
and nylock nuts.
F. Slide the two (2) inner support legs into the outer legs and temporarily secure with two (2)
3/8" x 2-1/2" hex bolts and nylock nuts.
G. Repeat
for the second set of legs, 56-1/2" below the first set
of legs.
Figure 3C
Advertising