Preparing the vertical drive (continued) – Grain Systems Unload Augers PNEG-1556 User Manual

Page 11

Advertising
background image

3. Installation

PNEG-1556 8", 10" and 12" Commercial Vertical Drive Unit - Dual Drive

11

Preparing the Vertical Drive (Continued)

D. Attach the two (2) leg support brackets to the mounting bracket pivot band using two (2)

3/4" x 4-1/2" hex bolts and nylock nuts.

E. Attach the two (2) outer support legs to the leg support brackets using two (2) 1/2" x 1-1/4" hex bolts

and nylock nuts.

F. Slide the two (2) inner support legs into the outer legs and temporarily secure with two (2)

3/8" x 2-1/2" hex bolts and nylock nuts.

(See Figure 3C.)

G. Repeat

Step C on Page 10

and

Step D-F

for the second set of legs, 56-1/2" below the first set

of legs.

Figure 3C

Advertising