3. Installation

12

PNEG-1556 8", 10" and 12" Commercial Vertical Drive Unit - Dual Drive

Attaching the Auger to the Bin

A. If the application requires an adapter plate, secure it to the bin unload tube before attaching the

vertical auger. Make sure that the adapter plate has a bolt located at 12 O’clock, when facing the
unload tube.

B. Raise the vertical auger and bolt the angle ring on the vertical auger to the angle ring on the

unload tube.

C. Adjust the feet at the bottom of the vertical auger to support the weight. See the table for the

appropriate minimum distance between the centerline of the unload tube and the ground.

D. Attach the inner support legs to the bin wall.

E. Adjust and tighten all the hardware for the support legs.

Attaching the Horizontal Flight

A. Slide the bin unload flight out through the vertical auger. In some applications the flight may have to

be unbolted from the center well.

B. Attach the horizontal head flight and bearing plate assembly with the appropriate hex bolts and

stover nuts.

(See Figure 3D.)

Figure 3D

Minimum Ground Clearance

8"

17-1/4"

10"

19-7/8"

12"

18-3/8"

Flight Attachment Hardware Size

8"

Two (2) 7/16" x 3" Grade 8 Hex Bolts and Stover Nuts

10"

Two (2) 1/2" x 3-1/2" Grade 8 Hex Bolts and Stover Nuts

12"

Two (2) 5/8" x 4" Grade 8 Hex Bolts and Stover Nuts