Installing the motor (not provided), Installation – Grain Systems Unload Augers PNEG-1556 User Manual

Page 24

Advertising
background image

3. Installation

24

PNEG-1556 8", 10" and 12" Commercial Vertical Drive Unit - Dual Drive

Installing the Motor (Not Provided)

A. Attach the motor to the motor mount plate using appropriate bolts, lock washers and hex nuts.

(See Chart Below.)

Motor Bolt Selection

B. Install pulley onto motor shaft and make sure that it is aligned with the flight pulley. It may be necessary

to move spacers to gain shaft alignment.

(See Figure 3P below

and

Figure 3Q on Page 25.)

Figure 3P

Motor Frame

Hex Bolt Size

Qty

56

5/16"-18 x 1-1/4"

4

143T

145T

182T

3/8"-16 x 1-1/4"

4

184T

213T

215T

254T

1/2"-13 x 1-3/4"

4

256T

Advertising