Perform pre-start checks – Grain Systems Unload Augers PNEG-1556 User Manual

Page 33

Advertising
background image

3. Installation

PNEG-1556 8", 10" and 12" Commercial Vertical Drive Unit - Dual Drive

33

Perform Pre-start Checks

A. Make sure ALL belts are properly tensioned.

B. Make sure ALL shields are in place and that the belt(s) and pulley(s) can move freely.

C. Inspect the drive unit for any problems or potential problems.

D. Be aware of any emergency shut down procedures. Two (2) people must always be in a position

where the operation of the equipment can be monitored.

E. Before starting the auger for the first time, make sure that all parts are assembled correctly according

to the instructions in this manual.

F. The bin wall inside the bin should have a control gate. The gate should be closed before start-up.

Failure to perform any or all of these pre-start checks may cause damage to the
equipment and/or cause SERIOUS INJURY or DEATH to those in the work area.
Failure to perform any or all of these pre-start checks may also be a misuse of
the equipment. Any misuse of the equipment may void the warranty.

ALWAYS keep ALL guards and shields in place, until all the power is
disconnected and locked out.

Make sure ONLY trained operators are in the work area before operating or
moving the machine. Two (2) people must always be in a position where the
operation of the equipment can be monitored.

Advertising