8. Vision/Dri-Tek Dryer Operation

PNEG-1717 CE Approved GSI/FFI Portable Dryer Manual

39

Figure 8D

21. After the required run time check the outgoing moisture and adjust the moisture control/meter roll

settings if required. A change in the settings will take the same drying time to show in the outgoing
moisture readings. 3°C Increase in temperature = 1% Moisture reduction.

Dry and Cool Continuous Flow Operation

1. Follow

Steps 1-9 on Page 37

for full heat continuous flow setup.

Figure 8E

2. Refer to PNEG-1650/PNEG-1651 for the dry and cool settings for the dryer. Note the drying time and

speed settings for the drying requirements.

3. Run the bottom fan/heater only for 20 minute. This will start the bottom drying grain.

4. Start the top fans and burners and run for drying time +10%.

See Step 10 on Page 37

example in full

heat drying start-up.

5. 20 Minute before drying time elapses, turn the bottom heater OFF but let the fan run and cool this

section. Set the upper plenum thermostats to the recommended temperature.

6. Follow

Step 11 on Page 37 to

Step 21

in full heat continuous flow operation.

NOTE: 2 Speed meter roll option works well if the grain entering the dryer has consistent moisture content.

For widely varying moisture contents, the 5 Speed option is recommended.