Hatch access door – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-739 User Manual
Page 19
Advertising
![background image](/manuals/277703/19/background.png)
PNEG-739 42" - 48" Platforms & Safety Cages
19
42'' Head Service Platform
1
Assemble the deck hatch access door by attach-
ing the left and right hand hinges to bottom side
of the outside toeboard, using 5/16" x 1" carraige
bolts. Leave hardware loose until the assembly
is complete. Attach the hinges & hatch decking
to the angle frame weldment and double nut the
hinge bolts - do not overtighten. (See Figure 1-9)
Hatch Access Door
FIGURE 1-9
Right Hand
Hatch Hinge
Left Hand
Hatch Hinge
Decking Hatch
Frame Weldment
GSB36222 (1)
Hatch Service
Hatch Decking
FIGURE 1-9