Distributor platform toeboards – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-739 User Manual

Page 31

Advertising
background image

PNEG-739 42" - 48" Platforms & Safety Cages

31

Distributor Platform Assembly

3

With support assembly attached to trunk and
hardware tightened, proceed by attaching the
notched toe board and unnotched toeboard to
the top of the support channel using the 5/16"
hardware provided. (Leave hardware loose). See
Figure 3-3.

The toeboards will not be centered on trunking
but should be offset to the ladder side. Platform
is designed to work for either side of trunking
access.

Distributor Platform

Toeboards

FIGURE 3-3

FIGURE 3-3

Notched Toeboard Angle

Toeboard Angle