3

This assembly is designed to be located at any
elevation on trunking that’s needed to provide ac-
cess to other equipment. Determine elevation of
platform surface and work from there. Locate all
parts required for assembly by using the charts
shown in the following figures.

Locate all clamp halves, clamp brackets, threaded
rods, and hardware to assemble clamps onto the
trunking. Measure the distance between the
clamps to assure proper location for support chan-
nels and knee brace attachment. See clamp

detail in FIgure 3-1 for hardware orientation.
Place 5/8" nuts and lock washers on a threaded
rod (one from each end). Place a clamp half on
each end of the rod and thread another nut and
lock washer to hold clamp in place. Now place
that assembly around trunk and place a clamp
bracket onto the opposite end of the clamp as-
sembly and use ½" hardware to fasten parts to-
gether. Adjust the position of the inside nuts of
the rod assembly to allow the clamps to be tight-
ened onto the trunking.

Clamp Brackets

TIGHTEN CLAMPS ONTO TRUNKING, DO NOT

OVERTIGHTEN AND COLLAPSE THE TRUNKING.

Position inside nuts back to the clamp and tighten.

FIGURE 3-1

42" SINGLE TRUNKING
DSP42007 (6)
Platform Brace Clamp Half
DSP42008 (3) Brace Clamp Rod
DSP42006 (3) Clamp Half, 42" (22)

48" SINGLE TRUNKING
DSP42007 (6)
Platform Brace Clamp Half
DSP48008 (3) Brace Clamp Rod
DSP48006 (3) Clamp Half, 48" (26)

FIGURE 3-1